Equipment Inspection

In May 2009, Turkmenbashi KNPZ carried out equipment inspection in the polypropylene production shop.

Pre-commissioning

In December 2008, I.C. INTERCOMPLECT LIMITED supplied a laboratory complex (produced by Chandler Engineering, USA) for the needs of the Turkmenneft State Concern.

Personnel training

From December 12 to 15, 2008, I.C. INTERCOMPLECT LIMITED organized new laboratory equipment training for the specialists of the Turkmenneft State Concern.